Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
682
matching recommendationsNAICS | 33243 | Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0230 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,837 | $1,500 | Not Implemented |
IC0230 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,781 | $13,282 | Not Implemented |
IC0230 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,524 | $50 | Implemented |
IC0230 # 04 Y:2020 | 04 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $15,197 | $0 | Not Implemented |
IC0230 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $212,444 | $108,320 | Implemented |
IC0230 # 06 Y:2020 | 06 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $45,814 | $7,700 | Not Implemented |
UK1915 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,711 | $2,510 | n/a |
UK1915 # 02 Y:2019 | 02 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $7,951 | $17,032 | n/a |
UK1915 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $259 | $260 | n/a |
UK1915 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,983 | $21,695 | n/a |
UK1915 # 05 Y:2019 | 05 | 2019 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $53,903 | $10,200 | n/a |
UK1915 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $13,534 | $26,305 | n/a |
UK1915 # 07 Y:2019 | 07 | 2019 | OPTIMIZE PLANT POWER FACTOR | $127,719 | $54,495 | n/a |
MZ0244 # 01 Y:2017 | 01 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,566 | $0 | Implemented |
MZ0244 # 02 Y:2017 | 02 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,898 | $46,100 | Implemented |
MZ0244 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $150 | $280 | Implemented |
MZ0244 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,371 | $0 | Implemented |
MZ0244 # 05 Y:2017 | 05 | 2017 | USE COMPRESSOR AIR FILTERS | $2,071 | $900 | Implemented |
MZ0244 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,568 | $2,900 | Implemented |
MZ0244 # 07 Y:2017 | 07 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $58,749 | $17,550 | Implemented |
MZ0244 # 08 Y:2017 | 08 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $966 | $4,050 | Not Implemented |
MZ0244 # 09 Y:2017 | 09 | 2017 | USE SOLAR HEAT TO HEAT WATER | $5,690 | $96,550 | Not Implemented |
MZ0238 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,673 | $17,248 | Implemented |
MZ0238 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,733 | $10,423 | Implemented |
MZ0238 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $903 | $760 | Implemented |