IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

453

matching recommendations
Reset
NAICS 332431 Metal Can Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0086 # 10 Y:2012 10 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $466 $3,100 Not Implemented
DL0086 # 11 Y:2012 11 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $493 $450 Not Implemented
DL0086 # 12 Y:2012 12 2012 RECOVER WASTE HEAT FROM EQUIPMENT $8,850 $10,000 Not Implemented
DL0086 # 13 Y:2012 13 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,800 $9,700 Not Implemented
DL0086 # 14 Y:2012 14 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,250 $300 Not Implemented
MA0679 # 01 Y:2011 01 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $70,691 $20,000 Implemented
MA0679 # 02 Y:2011 02 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $45,173 $20,100 Implemented
MA0679 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $24,174 $55,000 Implemented
MA0679 # 04 Y:2011 04 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,015 $30,000 Implemented
MA0679 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $12,376 $55,750 Implemented
MA0679 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,785 $11,650 Implemented
LE0282 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,837 $30,000 Not Implemented
LE0282 # 02 Y:2009 02 2009 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $20,433 $20,000 Implemented
LE0282 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,083 $1,760 Implemented
LE0282 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,314 $800 Not Implemented
LE0282 # 05 Y:2009 05 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,908 $3,000 Not Implemented
LE0282 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,538 $60,000 Implemented
LE0282 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $490 $450 Not Implemented
UW0009 # 01 Y:2007 01 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $93,799 $136,650 Not Implemented
UW0009 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,889 $1,720 Not Implemented
UW0009 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,369 $138,420 Not Implemented
UW0009 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,031 $7,140 Implemented
UW0009 # 05 Y:2007 05 2007 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $11,196 $2,080 Not Implemented
UW0009 # 06 Y:2007 06 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $4,114 $3,000 Not Implemented
UW0009 # 07 Y:2007 07 2007 DEVELOP A REPAIR/REPLACE POLICY $3,371 $1,984 Implemented