IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

327

matching recommendations
Reset
NAICS 332618 Other Fabricated Wire Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0536 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $1,796 $2,742 Implemented
UD0949 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,996 $57,770 Implemented
UD0949 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $66 $500 Not Implemented
UD0949 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $1,000 Implemented
UD0949 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $9,976 $4,120 Not Implemented
UD0949 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,691 $2,800 Not Implemented
UD0949 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,698 $2,125 Not Implemented
UD0949 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,312 $5,400 Implemented
IP0063 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,006 $2,156 Implemented
IP0063 # 10 Y:2016 10 2016 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $5,185 $9,768 Implemented
IP0063 # 09 Y:2016 09 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $113 $112 Implemented
IP0063 # 08 Y:2016 08 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $268 $240 Not Implemented
IP0063 # 07 Y:2016 07 2016 RECOVER WASTE HEAT FROM EQUIPMENT $839 $586 Not Implemented
IP0063 # 01 Y:2016 01 2016 MODIFY STARTUP/SHUTDOWN TIMES $2,912 $0 Not Implemented
IP0063 # 02 Y:2016 02 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,741 $0 Not Implemented
IP0063 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $170 $5 Implemented
IP0063 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $416 $3 Implemented
IP0063 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $36 Implemented
IP0063 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $2,624 $683 Not Implemented
LE0413 # 08 Y:2016 08 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,559 $14,000 Not Implemented
LE0413 # 07 Y:2016 07 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,462 $25,000 Implemented
LE0413 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,404 $15,000 Implemented
LE0413 # 05 Y:2016 05 2016 INSTALL TIMERS AND/OR THERMOSTATS $482 $590 Implemented
LE0413 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $973 $1,000 Implemented
LE0413 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $3,060 $1,800 Not Implemented