IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

441

matching recommendations
Reset
NAICS 3327 Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0228 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,378 $0 Implemented
SU0228 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $31,676 $40,711 Implemented
SU0228 # 03 Y:2006 03 2006 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $39,585 $111,774 Implemented
SU0228 # 04 Y:2006 04 2006 INCREASE USE OF AUTOMATION $1,765,875 $3,500,000 Implemented
TA0102 # 01 Y:2005 01 2005 USE POWER DURING OFF-PEAK PERIODS $20,445 $0 Implemented
TA0102 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,027 $110 Implemented
TA0102 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,700 $1,800 Implemented
LM0101 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,490 $18,642 Implemented
LM0101 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,390 $1,225 Implemented
LM0090 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $429 $280 Implemented
AM0473 # 01 Y:2004 01 2004 INSTALL TIMERS AND/OR THERMOSTATS $13,275 $2,300 Implemented
AM0473 # 02 Y:2004 02 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,780 $2,320 Implemented
AM0473 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,210 $400 Implemented
AM0473 # 07 Y:2004 07 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,980 $5,590 Implemented
AM0473 # 08 Y:2004 08 2004 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $18,434 $5,500 Implemented
SD0349 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,934 $4,300 Implemented
SD0349 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,757 $920 Implemented
SD0349 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,407 $3,423 Implemented
SD0349 # 06 Y:2004 06 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,780 $18,500 Implemented
NC0288 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,564 $435 Implemented
NC0288 # 02 Y:2004 02 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,570 $1,725 Implemented
NC0288 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $239 $100 Implemented
NC0288 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $15,216 $3,800 Implemented
BD0261 # 01 Y:2004 01 2004 USE PHOTOCELL CONTROLS $2,004 $1,500 Implemented
BD0261 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,039 $400 Implemented