IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,135

matching recommendations
Reset
NAICS 3327 Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0561 # 08 Y:2018 08 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $321 $34 Implemented
IC0205 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $1,769 Implemented
IC0205 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,390 $4,470 Implemented
IC0205 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,439 $0 Implemented
IC0205 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $611 $2,300 Not Implemented
IC0205 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $631 $50 Not Implemented
IC0205 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,523 $30 Implemented
IC0205 # 07 Y:2018 07 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,754 $1,197 Not Implemented
SF0515 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,061 $80 Not Implemented
SF0515 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,072 $2,241 Implemented
SF0515 # 03 Y:2018 03 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $15,870 $84,912 Not Implemented
OK0983 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,260 $1,710 Not Implemented
OK0983 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $192 $530 Not Implemented
OK0983 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $469 $1,256 Not Implemented
OK0983 # 04 Y:2018 04 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,532 $10,700 Not Implemented
OK0983 # 05 Y:2018 05 2018 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $395 $1,140 Not Implemented
OK0983 # 06 Y:2018 06 2018 USE RADIANT HEATER FOR SPOT HEATING $1,816 $4,820 Not Implemented
OK0983 # 07 Y:2018 07 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,912 $205,700 Not Implemented
OK0983 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,009 $4,410 Not Implemented
OK0983 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $588 $4,500 Not Implemented
OR0697 # 01 Y:2018 01 2018 USE MAGNETIC TECHNOLOGY TO TREAT WATER $201,762 $50,000 Implemented
OR0697 # 02 Y:2018 02 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,460 $45,600 Not Implemented
OR0697 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $25,653 $51,599 Implemented
OR0697 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,381 $19,381 Not Implemented
OR0697 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,725 $250 Implemented