IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

87

matching recommendations
Reset
NAICS 3327 Machine Shops; Turned Product; and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0670 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $200 Implemented
AM0670 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $810 Implemented
AM0670 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $645 $355 Implemented
AM0670 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $830 $8 Implemented
AM0670 # 05 Y:2014 05 2014 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,680 $0 Not Implemented
AM0598 # 01 Y:2011 01 2011 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $665,600 $1,000,000 Not Implemented
AM0598 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,540 $12,900 Implemented
AM0598 # 02 Y:2011 02 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $176,800 $119,000 Implemented
AM0598 # 07 Y:2011 07 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,220 $75 Implemented
AM0598 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $160 Implemented
AM0598 # 06 Y:2011 06 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $1,780 $0 Not Implemented
AM0598 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,800 $3,800 Implemented
AM0598 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,800 $1,000 Implemented
TA0102 # 01 Y:2005 01 2005 USE POWER DURING OFF-PEAK PERIODS $20,445 $0 Implemented
TA0102 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,027 $110 Implemented
TA0102 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,700 $1,800 Implemented
TA0102 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $0 Not Implemented
TA0102 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $148 Not Implemented
TA0091 # 06 Y:2005 06 2005 USE PHOTOCELL CONTROLS $520 $15 Not Implemented
TA0091 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,915 $975 Not Implemented
TA0091 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,600 $4,390 Not Implemented
TA0091 # 03 Y:2005 03 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,910 $2,332 Not Implemented
TA0091 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,750 $190 Not Implemented
TA0091 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $892 $117 Not Implemented
AM0473 # 01 Y:2004 01 2004 INSTALL TIMERS AND/OR THERMOSTATS $13,275 $2,300 Implemented