IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

487

matching recommendations
Reset
NAICS 33272 Turned Product and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0090 # 04 Y:2005 04 2005 DEVELOP STANDARD OPERATING PROCEDURES $2,898 $2,000 Not Implemented
LM0090 # 05 Y:2005 05 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $45,000 $32,440 Not Implemented
LM0090 # 06 Y:2005 06 2005 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $24,485 $2,000 Not Implemented
LM0090 # 07 Y:2005 07 2005 INSTALL SKYLIGHTS $2,790 $7,500 Not Implemented
SD0349 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $78,560 $164,000 Not Implemented
SD0349 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,934 $4,300 Implemented
SD0349 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,757 $920 Implemented
SD0349 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,407 $3,423 Implemented
SD0349 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $1,332 $369 Not Implemented
SD0349 # 06 Y:2004 06 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,780 $18,500 Implemented
NC0288 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,564 $435 Implemented
NC0288 # 02 Y:2004 02 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,570 $1,725 Implemented
NC0288 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $239 $100 Implemented
NC0288 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $15,216 $3,800 Implemented
NC0288 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,010 $1,580 Not Implemented
NC0288 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $222 $178 Not Implemented
NC0288 # 07 Y:2004 07 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,244 $18,900 Not Implemented
BD0265 # 01 Y:2004 01 2004 USE RADIANT HEATER FOR SPOT HEATING $27,949 $4,200 Not Implemented
BD0265 # 02 Y:2004 02 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,335 $20,000 Not Implemented
BD0265 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,398 $2,861 Not Implemented
BD0265 # 04 Y:2004 04 2004 USE SYNTHETIC LUBRICANT $4,332 $1,650 Not Implemented
BD0265 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,701 $1,200 Not Implemented
BD0265 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,323 $0 Not Implemented
BD0265 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,397 $2,200 Not Implemented
BD0265 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $782 $602 Not Implemented