IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

272

matching recommendations
Reset
NAICS 332722 Bolt, Nut, Screw, Rivet, and Washer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0788 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,125 $4,520 Implemented
AM0788 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,200 $17,300 Implemented
AM0788 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,355 $1,000 Implemented
AM0788 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $10,300 $28,750 Not Implemented
UD1003 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,300 $4,100 Implemented
UD1003 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,920 $0 Not Implemented
UD1003 # 06 Y:2019 06 2019 USE PHOTOCELL CONTROLS $1,712 $3,540 Not Implemented
UD1003 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $2,159 $728 Not Implemented
UD1003 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,211 $0 Implemented
UD1003 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,324 $0 Not Implemented
AM0785 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,450 $18,920 Implemented
AM0785 # 09 Y:2019 09 2019 INSTALL SKYLIGHTS $440 $0 Not Implemented
AM0785 # 08 Y:2019 08 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $620 $20 Implemented
AM0785 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,160 $650 Not Implemented
AM0785 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $1,340 $5,250 Not Implemented
AM0785 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,470 $460 Not Implemented
AM0785 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $4,685 $6,865 Implemented
AM0785 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,880 $2,000 Implemented
AM0785 # 01 Y:2019 01 2019 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $19,800 $750 Not Implemented
MI0354 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,262 $29,820 Not Implemented
MI0354 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $2,156 $2,559 Implemented
MI0354 # 05 Y:2019 05 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,590 $8,800 Implemented
MI0354 # 01 Y:2019 01 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $42,517 $105,476 Implemented
MI0354 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $12,789 $3,600 Implemented
MI0354 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,459 $80,434 Implemented