IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

830

matching recommendations
Reset
NAICS 33281 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0652 # 13 Y:2024 13 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,703 $2,400 Implemented
SD0652 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,448 $3,388 Implemented
SD0652 # 10 Y:2024 10 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,579 $33,698 Implemented
SD0652 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,198 $8,767 Implemented
SD0652 # 11 Y:2024 11 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,089 $2,000 Implemented
UL2317 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,159 $0 Implemented
TR0050 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,772 $272,678 Implemented
TR0050 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,139 $37,400 Implemented
TR0050 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $8,056 $79,654 Implemented
TR0050 # 03 Y:2023 03 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,636 $2,500 Implemented
SJ0011 # 07 Y:2024 07 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,389 $0 Implemented
UW2316 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $705 $2,080 Implemented
UW2316 # 02 Y:2023 02 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $73,471 $88,000 Implemented
NT0018 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,420 $11,457 Implemented
NT0017 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,009 $0 Implemented
NT0017 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $262 $0 Implemented
UC2312 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $9,710 $1,062 Implemented
UC2312 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,426 $1,300 Implemented
UC2312 # 07 Y:2023 07 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,620 $19,500 Implemented
UC2312 # 08 Y:2023 08 2023 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,522 $500 Implemented
UC2312 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,573 $75 Implemented
UC2312 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,502 $150 Implemented
UC2312 # 11 Y:2023 11 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $892 $2,151 Implemented
OR0776 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $1,131 $6,802 Implemented
NT0009 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,911 $5,609 Implemented