IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
NAICS 332812 Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0581 # 06 Y:2019 06 2019 RECYCLE WHITE WATER $8,651 $4,100 Implemented
WV0581 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $938 $0 Implemented
WV0581 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $4,849 $738 Implemented
WV0581 # 01 Y:2019 01 2019 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $128,494 $314,600 Not Implemented
WV0581 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,233 $58,107 Implemented
WV0581 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $28,868 $78,000 Implemented
WV0581 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $9,387 $4,000 Implemented
WV0581 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $100 Implemented
WV0581 # 02 Y:2019 02 2019 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $37,537 $5,500 Not Implemented
LE0445 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,590 $1,500 Implemented
LE0445 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,107 $1,000 Implemented
LE0445 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $6,692 Implemented
LE0445 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $525 $750 Implemented
LE0445 # 03 Y:2017 03 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,163 $3,000 Not Implemented
WV0406 # 02 Y:2010 02 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $75,243 $91,000 Not Implemented
WV0406 # 01 Y:2010 01 2010 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $165,791 $87,000 Not Implemented
WV0406 # 05 Y:2010 05 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,767 $65 Not Implemented
WV0406 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,089 $245 Not Implemented
WV0406 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,098 $49,200 Implemented
WV0406 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,356 $7,809 Not Implemented
WV0398 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,891 $900 Implemented
WV0398 # 08 Y:2009 08 2009 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $10,882 $1,000 Implemented
WV0398 # 07 Y:2009 07 2009 DEVELOP A REPAIR/REPLACE POLICY $11,204 $793 Implemented
WV0398 # 06 Y:2009 06 2009 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $11,848 $3,759 Not Implemented
WV0398 # 03 Y:2009 03 2009 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $97,378 $120,000 Not Implemented