IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

735

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0235 # 14 Y:2006 14 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,613 $9,400 Not Implemented
LM0106 # 01 Y:2006 01 2006 COVER OPEN TANKS $3,315 $1,500 Implemented
LM0106 # 02 Y:2006 02 2006 $33,590 $8,640 Not Implemented
MA0588 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $3,404 $2,197 Implemented
MA0588 # 02 Y:2005 02 2005 USE MINIMUM STEAM OPERATING PRESSURE $2,294 $500 Implemented
MA0588 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,994 $1,242 Not Implemented
MA0588 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,132 $4,668 Implemented
MA0588 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $812 $2,599 Not Implemented
MA0586 # 01 Y:2005 01 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,190 $0 Not Implemented
MA0586 # 02 Y:2005 02 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,081 $140 Implemented
MA0586 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,200 $0 Implemented
MA0586 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,415 $350 Not Implemented
MA0586 # 05 Y:2005 05 2005 COMBINE UTILITY METERS $1,736 $1,950 Implemented
MA0586 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $841 $1,646 Implemented
MA0586 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $443 $1,395 Implemented
IC0106 # 01 Y:2005 01 2005 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $19,946 $16,320 Implemented
IC0106 # 02 Y:2005 02 2005 REPAIR AND ELIMINATE STEAM LEAKS $32,401 $6,800 Implemented
IC0106 # 03 Y:2005 03 2005 REPAIR OR REPLACE STEAM TRAPS $10,215 $314 Implemented
IC0106 # 04 Y:2005 04 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $6,280 $46,950 Implemented
IC0106 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,132 $54,716 Not Implemented
IC0106 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $513 $107 Implemented
IC0106 # 07 Y:2005 07 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,315 $0 Implemented
IC0106 # 08 Y:2005 08 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $38,651 $1,902 Implemented
IC0106 # 09 Y:2005 09 2005 OPTIMIZE PLANT POWER FACTOR $69,451 $120,000 Implemented
IC0106 # 10 Y:2005 10 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $23,550 $2,522 Not Implemented