IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

735

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0106 # 11 Y:2005 11 2005 INSTALL TIMERS AND/OR THERMOSTATS $16,926 $20,423 Implemented
IC0106 # 12 Y:2005 12 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,545 $890 Implemented
IC0106 # 13 Y:2005 13 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,662 $900 Implemented
IC0106 # 14 Y:2005 14 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,959 $73,466 Implemented
WV0315 # 01 Y:2005 01 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $9,051 $901 Implemented
WV0315 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,726 $1,000 Implemented
WV0315 # 03 Y:2005 03 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,606 $3,300 Not Implemented
WV0315 # 04 Y:2005 04 2005 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,658 $0 Implemented
WV0315 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,969 $1,275 Not Implemented
WV0315 # 06 Y:2005 06 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,739 $1,060 Not Implemented
WV0315 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,495 $2,560 Implemented
WV0315 # 08 Y:2005 08 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,438 $640 Implemented
WV0315 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,395 $0 Not Implemented
WV0315 # 10 Y:2005 10 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,126 $20 Implemented
WV0315 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $985 $140 Implemented
WV0315 # 12 Y:2005 12 2005 DEVELOP A REPAIR/REPLACE POLICY $550 $97 Not Implemented
WV0315 # 13 Y:2005 13 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $521 $609 Not Implemented
WV0315 # 14 Y:2005 14 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $467 $20 Implemented
WI0488 # 01 Y:2005 01 2005 INCREASE USE OF AUTOMATION $64,000 $500,000 Implemented
WI0488 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,442 $86,314 Implemented
WI0488 # 03 Y:2005 03 2005 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $64,000 $17,000 Not Implemented
WI0488 # 04 Y:2005 04 2005 INSTALL TIMERS AND/OR THERMOSTATS $1,604 $600 Implemented
WI0488 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $347 $100 Implemented
WI0488 # 06 Y:2005 06 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $307 $156 Not Implemented
WI0488 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $131 $800 Not Implemented