IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0625 # 08 Y:2024 08 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $68,287 $300,000 Implemented
UF0625 # 09 Y:2024 09 2024 IMPROVE SPACE COMFORT CONDITIONING $31,920 $804 Implemented
UF0625 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,082 $469 Implemented
UF0625 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $710 $0 Implemented
UF0625 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,440 $6,188 Implemented
UF0625 # 03 Y:2024 03 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,895 $5,801 Implemented
UF0625 # 02 Y:2024 02 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $33,462 $12,390 Implemented
MI0401 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,273 $1,930 Implemented
MI0401 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,026 $580 Implemented
MI0401 # 03 Y:2022 03 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,485 $25,433 Implemented
MI0399 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,020 $320 Implemented
MI0399 # 04 Y:2021 04 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,245 $70,400 Implemented
MI0399 # 02 Y:2021 02 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $54,060 $240,000 Implemented
MI0399 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,405 $1,670 Implemented
MI0399 # 07 Y:2021 07 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,286 $4,468 Implemented
MI0387 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,993 $4,308 Implemented
MI0387 # 10 Y:2021 10 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,403 $4,900 Implemented
MI0387 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $1,412 $780 Implemented
MI0387 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,595 $1,980 Implemented
MI0387 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,824 $120 Implemented
MI0387 # 01 Y:2021 01 2021 AIR CONDITION ONLY SPACE NECESSARY $12,419 $16,940 Implemented
MI0286 # 02 Y:2015 02 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $14,710 $100,350 Implemented
MI0286 # 01 Y:2015 01 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $19,094 $29,862 Implemented
MI0285 # 04 Y:2015 04 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $13,892 $76,650 Implemented
MI0285 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,400 $80 Implemented