IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,304

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0291 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,254 $14,080 Not Implemented
LL0291 # 02 Y:2008 02 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,189 $722 Not Implemented
LL0291 # 03 Y:2008 03 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,965 $7,500 Not Implemented
LL0291 # 04 Y:2008 04 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $779 $775 Not Implemented
LL0291 # 05 Y:2008 05 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $589 $150 Implemented
LL0291 # 06 Y:2008 06 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $276 $231 Not Implemented
LL0291 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $180 $105 Implemented
MA0634 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,014 $119,495 Implemented
MA0634 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $11,407 $20,000 Not Implemented
MA0634 # 03 Y:2008 03 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,058 $3,000 Not Implemented
MA0634 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,932 $2,500 Implemented
MA0634 # 05 Y:2008 05 2008 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,034 $6,000 Not Implemented
MA0634 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $498 $500 Implemented
BD0340 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $93,388 $17,061 Not Implemented
BD0340 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $4,786 $1,501 Not Implemented
BD0340 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $381 Not Implemented
BD0340 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,817 $2 Not Implemented
BD0340 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,013 $1,501 Not Implemented
BD0340 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68,540 $501 Not Implemented
BD0340 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,077 $2,001 Not Implemented
BD0340 # 08 Y:2008 08 2008 USE RADIANT HEATER FOR SPOT HEATING $8,829 $30,001 Not Implemented
BD0340 # 09 Y:2008 09 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,245 $12,000 Not Implemented
BD0340 # 10 Y:2008 10 2008 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $662,215 $1,001 Not Implemented
OK0758 # 01 Y:2008 01 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,272 $20,990 Not Implemented
OK0758 # 02 Y:2008 02 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,470 $6,841 Not Implemented