Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 3329 | Other Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1124 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $28,751 | $511,000 | n/a |
OK1124 # 07 Y:2024 | 07 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $124,468 | $710,360 | n/a |
OK1124 # 06 Y:2024 | 06 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $25,553 | $5,538 | n/a |
OK1124 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $405 | $403 | n/a |
OK1124 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,780 | $520 | n/a |
OK1124 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,625 | $8,880 | n/a |
OK1124 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,690 | $117,898 | n/a |
NL0054 # 09 Y:2021 | 09 | 2021 | RECOVER AND REUSE WASTE MATERIAL | $1,876 | $6,000 | Not Implemented |
NL0054 # 08 Y:2021 | 08 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,217 | $1,920 | Not Implemented |
NL0054 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,528 | $7,371 | Not Implemented |
NL0054 # 06 Y:2021 | 06 | 2021 | ISOLATE HOT OR COLD EQUIPMENT | $3,823 | $1,018 | Not Implemented |
NL0054 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,098 | $4,000 | Not Implemented |
NL0054 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $16,506 | $12,500 | Not Implemented |
NL0054 # 02 Y:2021 | 02 | 2021 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $8,000 | $16,000 | Not Implemented |
NL0054 # 03 Y:2021 | 03 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,166 | $12,910 | Not Implemented |
NL0054 # 04 Y:2021 | 04 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,837 | $18,456 | Not Implemented |
OK1041 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,337 | $28,697 | Implemented |
OK1041 # 05 Y:2021 | 05 | 2021 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $614 | $219 | Implemented |
OK1041 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,223 | $1,690 | Implemented |
OK1041 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $896 | $1,927 | Implemented |
OK1041 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $180 | $0 | Not Implemented |
MZ0287 # 09 Y:2020 | 09 | 2020 | USE PHOTOCELL CONTROLS | $579 | $847 | Not Implemented |
MZ0287 # 08 Y:2020 | 08 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $638 | $1,220 | Not Implemented |
MZ0287 # 07 Y:2020 | 07 | 2020 | OPTIMIZE PLANT POWER FACTOR | $937 | $4,000 | Implemented |
MZ0287 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $2,755 | $5,978 | Implemented |