IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0296 # 05 Y:2020 05 2020 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,506 $8,000 Not Implemented
MZ0296 # 07 Y:2020 07 2020 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $57,876 $199,418 Not Implemented
MZ0296 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $336 $360 Not Implemented
MZ0296 # 04 Y:2020 04 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,669 $288 Not Implemented
MZ0296 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $669 $200 Not Implemented
MZ0296 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,596 $6,400 Not Implemented
MZ0296 # 06 Y:2020 06 2020 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $100,865 $197,145 Not Implemented
MZ0296 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $924 $1,200 Not Implemented
UD1023 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,553 $5,220 Not Implemented
UD1023 # 11 Y:2020 11 2020 REPLACE BOILER $6,824 $18,600 Not Implemented
UD1023 # 10 Y:2020 10 2020 INSTALL OCCUPANCY SENSORS $904 $560 Not Implemented
UD1023 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $936 $1,600 Not Implemented
UD1023 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $340 Not Implemented
UD1023 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,275 $3,000 Not Implemented
UD1023 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,341 $0 Not Implemented
UD1023 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $33,329 $14,912 Not Implemented
UD1023 # 03 Y:2020 03 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $163 $0 Not Implemented
UD1023 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $218 $0 Not Implemented
UD1023 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $9,882 $0 Not Implemented
SD0598 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $868 $693 Not Implemented
SD0598 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $243 $0 Implemented
SD0598 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,874 $2,784 Not Implemented
SD0598 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $688 $150 Implemented
BS0140 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,058 $0 Implemented
BS0140 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $466 $319 Implemented