Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
324
matching recommendationsNAICS | 33291 | Metal Valve Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2404 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $5,988 | $275 | Implemented |
LS2404 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $135 | Implemented |
LS2404 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,458 | $11,138 | Implemented |
LT8370 # 03 Y:2023 | 03 | 2023 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $24,363 | $0 | Implemented |
LT8370 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,034 | $0 | Implemented |
LT8370 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,372 | $1,800 | Implemented |
MZ0326 # 03 Y:2022 | 03 | 2022 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,085 | $144 | Implemented |
MZ0326 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,930 | $12,076 | Implemented |
MZ0326 # 11 Y:2022 | 11 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $384,733 | $2,868,753 | Implemented |
MZ0326 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $1,106 | $2,244 | Implemented |
MZ0326 # 07 Y:2022 | 07 | 2022 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $597 | $580 | Implemented |
MZ0326 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,449 | $3,200 | Implemented |
TT0276 # 09 Y:2022 | 09 | 2022 | CHANGE OPERATING CONDITIONS | $6,750 | $2,000 | Implemented |
TT0276 # 05 Y:2022 | 05 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,303 | $60 | Implemented |
TT0276 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,344 | $24,750 | Implemented |
TT0276 # 07 Y:2022 | 07 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,657 | $3,175 | Implemented |
MI0401 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,026 | $580 | Implemented |
MI0401 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,273 | $1,930 | Implemented |
MI0401 # 03 Y:2022 | 03 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,485 | $25,433 | Implemented |
MI0399 # 07 Y:2021 | 07 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,286 | $4,468 | Implemented |
MI0399 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,405 | $1,670 | Implemented |
MI0399 # 04 Y:2021 | 04 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $15,245 | $70,400 | Implemented |
MI0399 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,020 | $320 | Implemented |
MI0399 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $54,060 | $240,000 | Implemented |
MI0387 # 10 Y:2021 | 10 | 2021 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,403 | $4,900 | Implemented |