IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

328

matching recommendations
Reset
NAICS 33291 Metal Valve Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0283 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,087 $0 Implemented
OK1106 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,422 $50,026 Implemented
OK1106 # 05 Y:2024 05 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,777 $4,495 Implemented
LS2404 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $5,988 $275 Implemented
LS2404 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $135 Implemented
LS2404 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,458 $11,138 Implemented
LS2404 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,771 $3,080 Implemented
LT8370 # 03 Y:2023 03 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $24,363 $0 Implemented
LT8370 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,034 $0 Implemented
LT8370 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,372 $1,800 Implemented
MZ0326 # 07 Y:2022 07 2022 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $597 $580 Implemented
MZ0326 # 11 Y:2022 11 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $384,733 $2,868,753 Implemented
MZ0326 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $1,106 $2,244 Implemented
MZ0326 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,930 $12,076 Implemented
MZ0326 # 03 Y:2022 03 2022 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,085 $144 Implemented
MZ0326 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,449 $3,200 Implemented
TT0276 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $22,303 $60 Implemented
TT0276 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,657 $3,175 Implemented
TT0276 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,344 $24,750 Implemented
TT0276 # 09 Y:2022 09 2022 CHANGE OPERATING CONDITIONS $6,750 $2,000 Implemented
MI0401 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,273 $1,930 Implemented
MI0401 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,026 $580 Implemented
MI0401 # 03 Y:2022 03 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,485 $25,433 Implemented
MI0399 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,405 $1,670 Implemented
MI0399 # 04 Y:2021 04 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,245 $70,400 Implemented