Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
778
matching recommendationsNAICS | 33291 | Metal Valve Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0050 # 02 Y:2003 | 02 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,838 | $2,000 | Not Implemented |
UU0050 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,640 | $4,342 | Not Implemented |
UU0050 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,075 | $420 | Not Implemented |
UU0050 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $177 | $390 | Not Implemented |
UU0050 # 06 Y:2003 | 06 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,400 | $0 | Not Implemented |
UU0050 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,684 | $895 | Not Implemented |
UU0050 # 08 Y:2003 | 08 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,144 | $9,200 | Not Implemented |
LL0171 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,294 | $4,920 | Implemented |
LL0171 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $3,678 | $364 | Not Implemented |
LL0171 # 03 Y:2003 | 03 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,316 | $270 | Implemented |
LL0171 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,189 | $1,050 | Implemented |
LL0171 # 05 Y:2003 | 05 | 2003 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $1,170,000 | $15,240 | Implemented |
LL0171 # 06 Y:2003 | 06 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,125 | $318 | Implemented |
OK0666 # 01 Y:2003 | 01 | 2003 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $15,468 | $30,000 | Not Implemented |
OK0666 # 02 Y:2003 | 02 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $18,000 | $0 | Not Implemented |
OK0666 # 03 Y:2003 | 03 | 2003 | INSTALL SET-BACK TIMERS | $11,925 | $1,200 | Not Implemented |
OK0666 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $543 | $404 | Not Implemented |
OK0666 # 05 Y:2003 | 05 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,253 | $3,276 | Not Implemented |
OK0666 # 06 Y:2003 | 06 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $4,844 | $100 | Not Implemented |
OK0666 # 07 Y:2003 | 07 | 2003 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $136,157 | $28,500 | Not Implemented |
OK0666 # 08 Y:2003 | 08 | 2003 | IMPROVE SPACE COMFORT CONDITIONING | $58,240 | $20,000 | Not Implemented |
NC0255 # 01 Y:2003 | 01 | 2003 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $300,000 | $150,000 | Not Implemented |
NC0255 # 02 Y:2003 | 02 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,060 | $7,000 | Not Implemented |
NC0255 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,159 | $5,600 | Not Implemented |
NC0255 # 04 Y:2003 | 04 | 2003 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $3,602 | $500 | Not Implemented |