IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
NAICS 332911 Industrial Valve Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1106 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,422 $50,026 Implemented
OK1106 # 05 Y:2024 05 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,777 $4,495 Implemented
LS2404 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,458 $11,138 Implemented
LS2404 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,771 $3,080 Implemented
LS2404 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $135 Implemented
LS2404 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $5,988 $275 Implemented
MZ0326 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,449 $3,200 Implemented
MZ0326 # 11 Y:2022 11 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $384,733 $2,868,753 Implemented
MZ0326 # 03 Y:2022 03 2022 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,085 $144 Implemented
MZ0326 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,930 $12,076 Implemented
MZ0326 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $1,106 $2,244 Implemented
MZ0326 # 07 Y:2022 07 2022 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $597 $580 Implemented
MI0387 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,993 $4,308 Implemented
MI0387 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,595 $1,980 Implemented
MI0387 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $1,412 $780 Implemented
MI0387 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,824 $120 Implemented
MI0387 # 10 Y:2021 10 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,403 $4,900 Implemented
MI0387 # 01 Y:2021 01 2021 AIR CONDITION ONLY SPACE NECESSARY $12,419 $16,940 Implemented
AS0497 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,067 $104,184 Implemented
AS0497 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,810 $9,023 Implemented
AS0497 # 04 Y:2021 04 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $3,053 $678 Implemented
AS0497 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,227 $8,870 Implemented
AS0497 # 10 Y:2021 10 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $152 $287 Implemented
AS0497 # 07 Y:2021 07 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $978 $315 Implemented
AS0497 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $926 $250 Implemented