IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

296

matching recommendations
Reset
NAICS 332911 Industrial Valve Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0544 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $579 $2,000 Not Implemented
NC0544 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,344 $3,049 Implemented
NC0544 # 07 Y:2015 07 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,531 $563 Implemented
NC0544 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $806 $1,588 Not Implemented
NC0544 # 09 Y:2015 09 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,678 $200 Not Implemented
SD0512 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,138 $61,820 Not Implemented
SD0512 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,697 $25,608 Implemented
SD0512 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,185 $45,900 Implemented
SD0512 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,532 $800 Implemented
SD0512 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $3,224 $2,850 Implemented
SD0512 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,985 $5,247 Implemented
MA0738 # 01 Y:2015 01 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $59,139 $500 Implemented
MA0738 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,551 $1,000 Implemented
MA0738 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,739 $11,430 Not Implemented
MA0738 # 04 Y:2015 04 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,924 $3,000 Not Implemented
MA0738 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,433 $8,441 Not Implemented
MA0738 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $4,239 $2,000 Not Implemented
MA0738 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $347 $400 Implemented
AM0667 # 01 Y:2014 01 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,900 $400 Implemented
AM0667 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,040 $3,000 Implemented
AM0667 # 03 Y:2014 03 2014 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,380 $249 Not Implemented
AM0667 # 04 Y:2014 04 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,670 $550 Implemented
AM0667 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,300 $2,000 Implemented
AM0667 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,870 $8,750 Implemented
AM0667 # 07 Y:2014 07 2014 REUSE RAGS UNTIL COMPLETELY SOILED $2,200 $0 Implemented