IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

673

matching recommendations
Reset
NAICS 33299 All Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0927 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,025 $0 Implemented
UD0927 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,022 $300 Implemented
OK0906 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,273 $600 Implemented
BS0048 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,298 $28,509 Implemented
BS0048 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,926 $9,550 Implemented
BS0048 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,403 $5,220 Implemented
BS0048 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $1,969 $3,083 Implemented
BS0048 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $965 $175 Implemented
BS0048 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $168 $805 Implemented
BS0048 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $406 $722 Implemented
OK0890 # 02 Y:2014 02 2014 INSTALL COMMON HEADER ON COMPRESSORS $8,687 $4,800 Implemented
OK0890 # 04 Y:2014 04 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,200 $0 Implemented
OK0890 # 05 Y:2014 05 2014 AIR CONDITION ONLY SPACE NECESSARY $6,400 $1,230 Implemented
OK0890 # 06 Y:2014 06 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,700 $0 Implemented
OK0890 # 07 Y:2014 07 2014 USE MINIMUM SAFE OVEN VENTILATION $30,394 $1,000 Implemented
BS0034 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $7,083 $304 Implemented
BS0034 # 06 Y:2014 06 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,513 $2,503 Implemented
BS0034 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,850 $255 Implemented
BS0034 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,549 $4,061 Implemented
SD0484 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,136 $45,100 Implemented
SD0484 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,196 $1,300 Implemented
SD0484 # 04 Y:2014 04 2014 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $6,896 $400 Implemented
SD0484 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,758 $300 Implemented
SD0484 # 07 Y:2014 07 2014 USE PHOTOCELL CONTROLS $1,281 $3,700 Implemented
OK0871 # 01 Y:2014 01 2014 INSTALL SET-BACK TIMERS $1,092 $676 Implemented