IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,548

matching recommendations
Reset
NAICS 33299 All Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0234 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,361 $50 Implemented
AS0441 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $174,581 $25,494 Not Implemented
AS0441 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,783 $37,000 Implemented
AS0441 # 03 Y:2017 03 2017 USE SOLAR HEAT TO HEAT WATER $1,380 $1,005 Not Implemented
LE0439 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,940 $750 Not Implemented
LE0439 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,477 $600 Implemented
LE0439 # 03 Y:2017 03 2017 USE RADIANT HEATER FOR SPOT HEATING $17,188 $9,084 Not Implemented
LE0439 # 04 Y:2017 04 2017 TREAT AND REUSE RINSE WATERS $35,049 $30,000 Not Implemented
LE0439 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,559 $4,244 Not Implemented
LE0439 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,992 $5,000 Implemented
LE0439 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,903 $21,654 Implemented
LE0439 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,023 $105,761 Not Implemented
AS0436 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $100 Not Implemented
AS0436 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $8,511 $4,200 Not Implemented
AS0436 # 03 Y:2017 03 2017 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $887 $1,113 Not Implemented
AS0436 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106,561 $115,692 Not Implemented
AS0436 # 05 Y:2017 05 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,490 $12,200 Not Implemented
MA0773 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,653 $30,000 Not Implemented
MA0773 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,580 $14,050 Implemented
MA0773 # 03 Y:2017 03 2017 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,593 $10,625 Implemented
MA0773 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,564 $6,660 Not Implemented
MA0773 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $1,000 Implemented
MA0773 # 06 Y:2017 06 2017 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $501 $100 Not Implemented
SU0434 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $3,148 Not Implemented
SU0434 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,568 $0 Not Implemented