IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0520 # 06 Y:2015 06 2015 USE PHOTOCELL CONTROLS $1,826 $2,590 Implemented
SD0520 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $3,765 $9,630 Implemented
SD0520 # 04 Y:2015 04 2015 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $13,855 $24,332 Implemented
SD0520 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $25,778 $100,200 Implemented
SD0520 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,173 $100,875 Implemented
SD0520 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $43,686 $162,100 Implemented
SD0484 # 07 Y:2014 07 2014 USE PHOTOCELL CONTROLS $1,281 $3,700 Implemented
SD0484 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,758 $300 Implemented
SD0484 # 04 Y:2014 04 2014 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $6,896 $400 Implemented
SD0484 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,196 $1,300 Implemented
SD0484 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,136 $45,100 Implemented
SD0484 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $111,951 $87,500 Not Implemented
SD0484 # 06 Y:2014 06 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,388 $4,600 Not Implemented
SD0404 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,578 $0 Implemented
SD0404 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,544 $29,161 Implemented
SD0404 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,356 $8,130 Not Implemented
SD0404 # 04 Y:2008 04 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,382 $4,270 Not Implemented
SD0404 # 05 Y:2008 05 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,071 $2,035 Implemented
SD0404 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,452 $2,144 Implemented
SD0404 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,750 $5,772 Not Implemented
SD0404 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,928 $3,189 Implemented
SD0404 # 09 Y:2008 09 2008 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $62,662 $213,472 Not Implemented
SD0404 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,517 $720 Implemented
LM0087 # 04 Y:2005 04 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,685 $450 Not Implemented
LM0087 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,413 $0 Not Implemented