IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

897

matching recommendations
Reset
NAICS 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0275 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,053 $470 Not Implemented
BD0275 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $391 $360 Implemented
BD0275 # 10 Y:2005 10 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $262,080 $80,000 Implemented
BD0275 # 11 Y:2005 11 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $121,680 $500,000 Implemented
BD0275 # 12 Y:2005 12 2005 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $67,500 $2,580 Implemented
BD0276 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $27,550 $24,000 Not Implemented
BD0276 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,544 $48,000 Implemented
BD0276 # 03 Y:2005 03 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $8,381 $2,000 Not Implemented
BD0276 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,365 $13,346 n/a
BD0276 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,120 $740 Not Implemented
BD0276 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,665 $225 Not Implemented
BD0276 # 07 Y:2005 07 2005 INSTALL TURBULATORS $1,362 $2,150 Not Implemented
BD0276 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $474 $800 Not Implemented
BD0276 # 09 Y:2005 09 2005 RECOVER AND REUSE COOLING WATER $1,360 $4,000 Not Implemented
LM0087 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,069 $17,418 Implemented
LM0087 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,466 $760 Implemented
LM0087 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,413 $0 Not Implemented
LM0087 # 04 Y:2005 04 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,685 $450 Not Implemented
LM0087 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $244 $377 Implemented
LM0087 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,321 $1,000 Implemented
LM0087 # 07 Y:2005 07 2005 MODIFY WORKLOAD $23,000 $9,700 Not Implemented
LM0087 # 08 Y:2005 08 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $19,500 $3,680 Implemented
MS0264 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $84,783 Implemented
MS0264 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,737 $318 Implemented
MS0264 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $2,457 $480 Not Implemented