IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0542 # 06 Y:2015 06 2015 ISOLATE HOT OR COLD EQUIPMENT $5,296 $420 Implemented
NC0542 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,576 $510 Implemented
NC0542 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $3,364 $5,865 Implemented
NC0542 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $741 $140 Implemented
NC0542 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $144 Implemented
NC0542 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,925 $8,373 Implemented
NC0542 # 13 Y:2015 13 2015 INSTALL OCCUPANCY SENSORS $1,213 $500 Implemented
UM0460 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,160 $1,100 Implemented
UM0460 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,526 $161,000 Implemented
UM0460 # 05 Y:2015 05 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,072 $4,000 Implemented
MA0746 # 01 Y:2015 01 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $14,457 $7,354 Implemented
MA0746 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,017 $88,800 Implemented
MA0746 # 03 Y:2015 03 2015 REDUCE VENTILATION AIR $13,483 $3,785 Implemented
MA0746 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,070 $2,100 Implemented
MA0746 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,299 $3,000 Implemented
MA0746 # 06 Y:2015 06 2015 REPAIR OR REPLACE STEAM TRAPS $2,323 $362 Implemented
MA0746 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,874 $2,960 Implemented
WM0068 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,873 $2,860 Implemented
WM0068 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,592 $990 Implemented
WM0068 # 09 Y:2015 09 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,440 $3,575 Implemented
WM0067 # 04 Y:2015 04 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,416 $0 Implemented
WM0067 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,586 $1,680 Implemented
WM0067 # 10 Y:2015 10 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,592 $640 Implemented
WM0067 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,495 $10,871 Implemented
WM0067 # 13 Y:2015 13 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,678 $0 Implemented