IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0054 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,700 $4,500 Implemented
TT0054 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,240 $4,000 Implemented
TT0054 # 06 Y:2010 06 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $410 $50 Implemented
AM0576 # 01 Y:2010 01 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,160 $0 Implemented
AM0576 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,800 $20,100 Implemented
AM0576 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $300 Implemented
AM0576 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $1,263 $79 Implemented
AM0576 # 06 Y:2010 06 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,040 $760 Implemented
UM0364 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,618 $7,917 Implemented
UM0364 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $913 $2,000 Implemented
UM0364 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,885 $5,500 Implemented
UM0364 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,735 $500 Implemented
MA0661 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $562 $588 Implemented
MA0661 # 03 Y:2010 03 2010 REDUCE VENTILATION AIR $31,319 $17,008 Implemented
MA0661 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $707 $110 Implemented
MA0661 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $232 $260 Implemented
MA0661 # 06 Y:2010 06 2010 AIR CONDITION ONLY SPACE NECESSARY $2,526 $11,040 Implemented
CO0634 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,990 $920 Implemented
CO0634 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $1,000 Implemented
CO0634 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,550 $41,810 Implemented
MA0660 # 05 Y:2010 05 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $23,123 $0 Implemented
MA0660 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,403 $9,546 Implemented
MA0660 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $58,587 $0 Implemented
LE0297 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,029 $785 Implemented
LE0297 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,875 $1,760 Implemented