Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

261

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1086 # 02 Y:2024 02 2024 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $573 $0 Implemented
UD1086 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $561 $0 Implemented
UD1084 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,134 $3,775 Implemented
UD1084 # 01 Y:2024 01 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,386 $0 Implemented
UD1082 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $35,677 $0 Implemented
UD1082 # 09 Y:2024 09 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,739 $18,600 Implemented
UD1082 # 10 Y:2024 10 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $245 $0 Implemented
UD1082 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $12,369 $0 Implemented
UD1082 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,232 $1,235 Implemented
UD1082 # 08 Y:2024 08 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,575 $11,626 Implemented
UD1082 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,327 $9,308 Implemented
UD1061 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $952 Implemented
UD1061 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,024 $375 Implemented
MU0028 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,186 $0 Implemented
MU0028 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,919 $0 Implemented
MU0028 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $138 $348 Implemented
MU0028 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $863 $112 Implemented
MU0028 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $643 $1,100 Implemented
UD1058 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,636 $952 Implemented
UD1058 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $282 $0 Implemented
UD1058 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,307 $29,827 Implemented
CW0121 # 06 Y:2022 06 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $461 $517 Implemented
CW0121 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,581 $0 Implemented
CW0121 # 05 Y:2022 05 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $31,088 $86,330 Implemented
CW0121 # 03 Y:2022 03 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,746 $265 Implemented