IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

218

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0361 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $322,316 $3,602,500 n/a
MZ0361 # 08 Y:2024 08 2024 MINIMIZE WATER USAGE $71,580 $385,388 n/a
MZ0361 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,784 $1,000 n/a
MZ0361 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,882 $33,744 n/a
MZ0361 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,633 $6,555 n/a
MZ0361 # 06 Y:2024 06 2024 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $45,827 $6,720 n/a
MZ0361 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,374 $117,036 n/a
MZ0361 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $2,158 $1,750 n/a
MZ0361 # 03 Y:2024 03 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,797 $4,800 n/a
MZ0340 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $618 $260 Implemented
MZ0340 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,531 $5,336 Implemented
MZ0340 # 07 Y:2023 07 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $188,061 $900,000 Not Implemented
MZ0340 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,084 $18,000 Not Implemented
MZ0340 # 05 Y:2023 05 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,940 $4,520 Not Implemented
MZ0340 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,810 $3,202 Not Implemented
MZ0340 # 02 Y:2023 02 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,688 $320 Implemented
MZ0340 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,529 $720 Implemented
MZ0315 # 07 Y:2022 07 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,981 $1,350 Not Implemented
MZ0315 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,247 $250 Implemented
MZ0315 # 01 Y:2022 01 2022 USE RADIANT HEATER FOR SPOT HEATING $15,635 $15,360 Not Implemented
MZ0315 # 06 Y:2022 06 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $16,735 $15,782 Implemented
MZ0315 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $3,818 $360 Implemented
MZ0315 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $138,217 $836,000 Not Implemented
MZ0315 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,404 $480 Implemented
MZ0315 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,771 $14,420 Implemented