Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

292

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0678 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,836 $10,835 Implemented
OK0678 # 04 Y:2004 04 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,162 $800 Implemented
OK0678 # 05 Y:2004 05 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,602 $28,350 Not Implemented
OK0678 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,188 $12,597 Not Implemented
OK0678 # 07 Y:2004 07 2004 INSTALL SET-BACK TIMERS $3,347 $2,200 Implemented
OK0678 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,847 $14,078 Not Implemented
OK0678 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $546 $1,154 Implemented
OK0678 # 10 Y:2004 10 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,985 $0 Not Implemented
OK0689 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,021 $1,180 Not Implemented
OK0689 # 02 Y:2004 02 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $857 $0 Not Implemented
OK0689 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,079 $2,156 Implemented
OK0689 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,433 $252 Implemented
OK0689 # 05 Y:2004 05 2004 INSTALL SET-BACK TIMERS $853 $822 Not Implemented
OK0689 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,521 $472 Not Implemented
OK0689 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,393 $758 Not Implemented
OK0675 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $274 $256 Implemented
OK0675 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $124 $231 Not Implemented
OK0675 # 03 Y:2003 03 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,171 $2,000 Implemented
OK0675 # 04 Y:2003 04 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,210 $2,000 Not Implemented
OK0675 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $565 $367 Implemented
OK0675 # 06 Y:2003 06 2003 OPTIMIZE PLANT POWER FACTOR $428 $2,730 Not Implemented
OK0675 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,672 $2,173 Not Implemented
OK0675 # 08 Y:2003 08 2003 INSTALL SET-BACK TIMERS $1,993 $0 Not Implemented
OK0675 # 09 Y:2003 09 2003 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $14,350 $23,640 Not Implemented
OK0675 # 10 Y:2003 10 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $61,378 $3,000 Not Implemented