IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

151

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1034 # 06 Y:2020 06 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,799 $0 Implemented
OK1034 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $459 $320 Implemented
OK1034 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,014 $2,340 Not Implemented
OK1034 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,909 $49,013 Implemented
MZ0275 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $12,533 $24,500 Not Implemented
MZ0275 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $7,081 Not Implemented
MZ0275 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $5,169 $10,500 Not Implemented
MZ0275 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,201 $3,250 Not Implemented
MZ0275 # 05 Y:2020 05 2020 USE PHOTOCELL CONTROLS $1,385 $1,440 Not Implemented
MZ0275 # 06 Y:2020 06 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,072 $2,400 Not Implemented
OK1018 # 07 Y:2019 07 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $507 $219 Not Implemented
OK1018 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,577 $0 Not Implemented
OK1018 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $44,286 $21,990 Not Implemented
OK1018 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,409 $4,914 Not Implemented
OK1018 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,691 $60,951 Not Implemented
OK1018 # 06 Y:2019 06 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $547 $0 Not Implemented
OK1018 # 08 Y:2019 08 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,546 $0 Not Implemented
OK1018 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,422 $870 Not Implemented
MZ0265 # 09 Y:2019 09 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,984 $2,731 Not Implemented
MZ0265 # 08 Y:2019 08 2019 OPTIMIZE PLANT POWER FACTOR $14,079 $20,625 Implemented
MZ0265 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,079 $2,052 Implemented
MZ0265 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,922 $1,406 Implemented
MZ0265 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $5,073 $1,940 Implemented
MZ0265 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $9,670 $3,552 Not Implemented
MZ0265 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,740 $2,302 Not Implemented