IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

609

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0112 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,643 $848 Not Implemented
CW0112 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,658 $100 Implemented
CW0112 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,912 $330 Implemented
WV0575 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,365 $5,150 Not Implemented
WV0575 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $2,374 $8,525 Not Implemented
WV0575 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,872 $896 Implemented
WV0575 # 04 Y:2019 04 2019 INSTALL SET-BACK TIMERS $1,692 $105 Implemented
WV0575 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $940 $70 Implemented
WV0575 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $715 $1,275 Not Implemented
WV0575 # 07 Y:2019 07 2019 RECYCLE WHITE WATER $674 $2,000 Not Implemented
WV0575 # 08 Y:2019 08 2019 DEVELOP A REPAIR/REPLACE POLICY $576 $558 Implemented
WV0575 # 09 Y:2019 09 2019 MINIMIZE WATER USAGE $510 $1,400 Not Implemented
UD0985 # 07 Y:2018 07 2018 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,420 $25,000 Implemented
UD0985 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,998 $55,816 Implemented
UD0985 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $320 $1,500 Not Implemented
UD0985 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $938 $0 Not Implemented
UD0985 # 03 Y:2018 03 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $957 $2,500 Implemented
UD0985 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,260 $1,000 Implemented
UD0985 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,113 $0 Implemented
UD0960 # 09 Y:2017 09 2017 REDUCE EXCESSIVE BOILER BLOWDOWN $5,234 $7,500 Not Implemented
UD0960 # 14 Y:2017 14 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,599 $9,362 Not Implemented
UD0960 # 13 Y:2017 13 2017 INSTALL OCCUPANCY SENSORS $6,486 $9,108 Not Implemented
UD0960 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,179 $97,386 Not Implemented
UD0960 # 11 Y:2017 11 2017 USE MINIMUM STEAM OPERATING PRESSURE $826 $0 Not Implemented
UD0960 # 10 Y:2017 10 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,121 $0 Not Implemented