IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,251

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0982 # 10 Y:2018 10 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,443 $0 Implemented
UD0982 # 11 Y:2018 11 2018 INSTALL OCCUPANCY SENSORS $5,167 $1,500 Implemented
UD0982 # 12 Y:2018 12 2018 ADD AREA LIGHTING SWITCHES $675 $500 Implemented
UD0982 # 13 Y:2018 13 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $13,372 $10,000 Implemented
SU0455 # 01 Y:2018 01 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,432 $0 Implemented
SU0455 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,032 $51,111 Implemented
SU0455 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $461 $1,045 Implemented
SU0455 # 04 Y:2018 04 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $284 $666 Not Implemented
SU0455 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $199 $491 Not Implemented
SU0455 # 06 Y:2018 06 2018 REPLACE BOILER $14,840 $64,975 Not Implemented
NL0015 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,693 $189,100 Implemented
NL0015 # 02 Y:2017 02 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,416 $0 Implemented
NL0015 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $5,079 $12,500 Not Implemented
NL0015 # 04 Y:2017 04 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,800 $0 Implemented
NL0015 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,190 $4,500 Implemented
IC0199 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,264 $4,650 Not Implemented
IC0199 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,101 $1,146 Not Implemented
IC0199 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,964 $3,000 Not Implemented
IC0199 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,064 $50 Not Implemented
IC0199 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,586 $4,651 Not Implemented
WM0113 # 01 Y:2017 01 2017 USE SYNTHETIC LUBRICANT $21,176 $32,727 Not Implemented
WM0113 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,921 $18,856 Implemented
WM0113 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,755 $3,309 Not Implemented
WM0113 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,437 $3,721 Not Implemented
WM0113 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,074 $0 Not Implemented