IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

547

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1087 # 07 Y:2023 07 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,468 $72,450 Implemented
OK1087 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,321 $11,550 Implemented
NL0077 # 02 Y:2023 02 2023 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $121,895 $4,200 Implemented
NL0077 # 06 Y:2023 06 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $527 $200 Implemented
NL0077 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,279 $4,500 Implemented
MZ0340 # 02 Y:2023 02 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,688 $320 Implemented
MZ0340 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,529 $720 Implemented
MZ0340 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $618 $260 Implemented
MZ0340 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,531 $5,336 Implemented
OK1080 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,757 $5,295 Implemented
OK1080 # 05 Y:2023 05 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $21,682 $4,810 Implemented
OK1080 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $21,187 $25,000 Implemented
WV0630 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,677 $7,291 Implemented
WV0630 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $405 $1,431 Implemented
WV0630 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $706 $2,559 Implemented
WV0630 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,523 $279 Implemented
WV0630 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $305 $510 Implemented
WV0630 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $371 $911 Implemented
OR0754 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,033 $3,560 Implemented
OR0754 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,871 $2,675 Implemented
WV0623 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $72,629 $104,885 Implemented
WV0623 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $51,704 $257,600 Implemented
WV0623 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $61,441 $127,733 Implemented
WV0623 # 14 Y:2022 14 2022 DEVELOP A REPAIR/REPLACE POLICY $1,356 $2,300 Implemented
WV0623 # 13 Y:2022 13 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,487 $990 Implemented