IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1087 # 01 Y:2023 01 2023 USE RADIANT HEATER FOR SPOT HEATING $18,209 $91,432 Implemented
OK1087 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $71,142 $168,192 Implemented
OK1087 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,321 $11,550 Implemented
OK1087 # 07 Y:2023 07 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,468 $72,450 Implemented
OK1080 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $21,187 $25,000 Implemented
OK1080 # 05 Y:2023 05 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $21,682 $4,810 Implemented
OK1080 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,757 $5,295 Implemented
OK1068 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,325 $5,412 Implemented
OK1068 # 03 Y:2022 03 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,553 $3,192 Implemented
OK1068 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,141 $1,208 Implemented
OK1068 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,103 $0 Implemented
OK1064 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,321 $22,000 Implemented
OK1064 # 03 Y:2022 03 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $367 $700 Implemented
OK1064 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,414 $774 Implemented
OK1010 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $7,438 $1,936 Implemented
OK1010 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $1,760 Implemented
OK1010 # 03 Y:2019 03 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,032 $947 Implemented
OK1010 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $4,905 $12,400 Implemented
OK0966 # 02 Y:2017 02 2017 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $113,700 $24,000 Implemented
OK0966 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74,450 $305,694 Implemented
OK0966 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,526 $21,137 Implemented
OK0966 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,570 $17,250 Implemented
OK0966 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,676 $17,550 Implemented
OK0966 # 09 Y:2017 09 2017 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $36 $100 Implemented
OK0895 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $706 $1,400 Implemented