IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

251

matching recommendations
Reset
NAICS 333111 Farm Machinery and Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0203 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,105 $960 Implemented
SU0203 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,344 $1,090 Not Implemented
SU0203 # 07 Y:2005 07 2005 INSTALL SOLID WASTE INCINERATOR FOR HEAT $16,477 $25,850 Not Implemented
IA0341 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $7,506 $1,200 Not Implemented
IA0341 # 02 Y:2004 02 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,502 $700 Implemented
IA0341 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,519 $460 Implemented
IA0341 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $105 Implemented
IA0341 # 05 Y:2004 05 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,040 $54,300 Implemented
IA0341 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $194 Implemented
IA0341 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $1,990 Implemented
IA0341 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $123 $289 Implemented
UD0675 # 01 Y:2003 01 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $26,842 $625 Implemented
UD0675 # 02 Y:2003 02 2003 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $10,610 $1,200 Implemented
UD0675 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $7,934 $2,500 Not Implemented
UD0675 # 04 Y:2003 04 2003 COMBINE UTILITY METERS $4,000 $0 Not Implemented
UD0675 # 05 Y:2003 05 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,130 $0 Implemented
UD0675 # 06 Y:2003 06 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,068 $384 Implemented
UD0675 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,355 $280 Implemented
UD0675 # 08 Y:2003 08 2003 REDUCE FLUID FLOW RATES $2,011 $1,200 Not Implemented
UD0675 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,480 $9,600 Not Implemented
UD0675 # 10 Y:2003 10 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $695 $0 Implemented
UD0675 # 11 Y:2003 11 2003 RECOVER WASTE HEAT FROM EQUIPMENT $525 $1,750 Not Implemented
UD0675 # 12 Y:2003 12 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $430 $100 Implemented
UD0675 # 13 Y:2003 13 2003 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $250 $424 Not Implemented
UD0675 # 14 Y:2003 14 2003 ADD AREA LIGHTING SWITCHES $240 $200 Not Implemented