IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

749

matching recommendations
Reset
NAICS 33324 Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0113 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,437 $3,721 Not Implemented
WM0113 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,074 $0 Not Implemented
WM0113 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $684 $1,000 Not Implemented
WM0113 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $235 $800 Not Implemented
UD0957 # 01 Y:2016 01 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,501 $0 Not Implemented
UD0957 # 02 Y:2016 02 2016 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $7,063 $0 Implemented
UD0957 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,975 $0 Not Implemented
UD0957 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,213 $0 Implemented
UD0957 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,040 $1,000 Not Implemented
UD0957 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,859 $86,636 Implemented
UD0957 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,818 $6,804 Implemented
UD0957 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $4,660 $7,056 Not Implemented
UD0957 # 09 Y:2016 09 2016 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $17,416 $4,660 Not Implemented
CO0729 # 01 Y:2016 01 2016 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $70,080 $60,480 n/a
CO0729 # 02 Y:2016 02 2016 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $25,340 $123,200 n/a
CO0729 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,510 $51,780 n/a
CO0729 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,100 $6,040 n/a
UM0467 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $1,731 $1,080 n/a
UM0467 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $257 $1,170 n/a
UM0467 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,341 $1,946 n/a
UM0467 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,908 $7,823 n/a
UM0467 # 05 Y:2016 05 2016 COVER OPEN TANKS $4,591 $524 n/a
UM0467 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,544 $2,000 n/a
UM0467 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $56 $100 n/a
UM0467 # 08 Y:2016 08 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $1,938 $5,400 n/a