IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
NAICS 33324 Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0305 # 04 Y:2011 04 2011 OPTIMIZE PLANT POWER FACTOR $4,313 $16,531 Not Implemented
SU0305 # 03 Y:2011 03 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,040 $34,682 Not Implemented
SU0305 # 02 Y:2011 02 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $344 $645 Implemented
SU0305 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $786 $196 Not Implemented
SU0233 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,395 $0 Not Implemented
SU0233 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,203 $0 Implemented
SU0233 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $2,163 $0 Implemented
SU0233 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,001 $0 Implemented
SU0233 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,928 $542 Not Implemented
SU0233 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,182 $1,050 Implemented
SU0233 # 07 Y:2006 07 2006 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $14,472 $9,451 Not Implemented
SU0233 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,003 $7,100 Not Implemented
SU0233 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,954 $81,620 Not Implemented
SU0233 # 10 Y:2006 10 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $392 $687 Not Implemented
SU0233 # 11 Y:2006 11 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,021 $11,554 Not Implemented
SU0194 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $2,404 $868 Implemented
SU0194 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $662 $0 Implemented
SU0194 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $734 $11 Implemented
SU0194 # 07 Y:2004 07 2004 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $1,122 $2,975 Not Implemented
SU0194 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $154 Implemented
SU0194 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,484 $576 Implemented
SU0194 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,623 $1,616 Implemented
SU0155 # 06 Y:2003 06 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,195 $4,877 Not Implemented
SU0155 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,755 $320 Implemented
SU0155 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,406 $420 Not Implemented