Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
76
matching recommendationsNAICS | 333242 | Semiconductor Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0066 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,219 | $907 | Not Implemented |
BS0066 # 02 Y:2015 | 02 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,531 | $26 | Not Implemented |
BS0066 # 01 Y:2015 | 01 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,458 | $568 | Not Implemented |
MA0707 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $412 | $200 | Implemented |
MA0707 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $439 | $3,057 | Not Implemented |
MA0707 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $807 | $1,840 | Not Implemented |
MA0707 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $972 | $200 | Implemented |
MA0707 # 01 Y:2013 | 01 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,613 | $1,000 | Implemented |
SU0233 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,395 | $0 | Not Implemented |
SU0233 # 01 Y:2006 | 01 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,203 | $0 | Implemented |
SU0233 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,954 | $81,620 | Not Implemented |
SU0233 # 03 Y:2006 | 03 | 2006 | USE SYNTHETIC LUBRICANT | $2,163 | $0 | Implemented |
SU0233 # 04 Y:2006 | 04 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,001 | $0 | Implemented |
SU0233 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,928 | $542 | Not Implemented |
SU0233 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,182 | $1,050 | Implemented |
SU0233 # 07 Y:2006 | 07 | 2006 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $14,472 | $9,451 | Not Implemented |
SU0233 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,003 | $7,100 | Not Implemented |
SU0233 # 11 Y:2006 | 11 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,021 | $11,554 | Not Implemented |
SU0233 # 10 Y:2006 | 10 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $392 | $687 | Not Implemented |
LE0201 # 02 Y:2004 | 02 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,658 | $0 | Not Implemented |
LE0201 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,994 | $0 | Implemented |
LE0201 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,356 | $2,500 | Implemented |
LE0201 # 04 Y:2004 | 04 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,622 | $450 | Not Implemented |
LE0201 # 05 Y:2004 | 05 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $551 | $150 | Implemented |
LE0201 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $196 | $150 | Not Implemented |