IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

483

matching recommendations
Reset
NAICS 3333 Commercial and Service Industry Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0241 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $765 $201 Implemented
SU0241 # 05 Y:2006 05 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,054 $2,928 Implemented
SU0241 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $290 $239 Not Implemented
SU0241 # 07 Y:2006 07 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $602 $712 Not Implemented
SU0241 # 08 Y:2006 08 2006 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $10,784 $19,571 Not Implemented
SU0241 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,800 $24,622 Implemented
UF0382 # 01 Y:2006 01 2006 USE PHOTOCELL CONTROLS $4,721 $2,760 Not Implemented
UF0382 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,902 $900 Not Implemented
UF0382 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $1,971 $1,275 Not Implemented
UF0382 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,024 $7,567 Not Implemented
UF0382 # 05 Y:2006 05 2006 ADD AREA LIGHTING SWITCHES $515 $2,079 Not Implemented
UF0382 # 06 Y:2006 06 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $21,646 $1,350 Not Implemented
UF0382 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $1,876 $571 Not Implemented
UF0382 # 08 Y:2006 08 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,305 $1,000 Not Implemented
UF0382 # 09 Y:2006 09 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $393 $0 Not Implemented
UF0382 # 10 Y:2006 10 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,973 $0 Not Implemented
UF0382 # 11 Y:2006 11 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,029 $3,200 Not Implemented
UF0382 # 12 Y:2006 12 2006 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $6,821 $0 Not Implemented
UF0382 # 13 Y:2006 13 2006 RECYCLE FLUORESCENT LAMPS $342 $3,237 Not Implemented
UF0382 # 14 Y:2006 14 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,240 $8,000 Not Implemented
AS0414 # 01 Y:2006 01 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $813,934 $3,030,000 Not Implemented
AS0414 # 02 Y:2006 02 2006 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $28,518 $20,000 Implemented
AS0414 # 03 Y:2006 03 2006 PAY BILLS ON TIME TO AVOID LATE FEES $17,731 $200 Implemented
OR0498 # 01 Y:2006 01 2006 COVER OPEN TANKS $7,300 $3,600 Implemented
OR0498 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,300 $0 Not Implemented