Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 333415 | Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0250 # 08 Y:2021 | 08 | 2021 | INSTALL OCCUPANCY SENSORS | $1,245 | $1,068 | Not Implemented |
TT0250 # 07 Y:2021 | 07 | 2021 | AVOID EMERGENCY REWIND OF MOTORS | $1,333 | $400 | Implemented |
TT0250 # 06 Y:2021 | 06 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $1,587 | $3,500 | Implemented |
TT0250 # 05 Y:2021 | 05 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $1,600 | $160 | Not Implemented |
TT0250 # 04 Y:2021 | 04 | 2021 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $2,240 | $4,500 | Implemented |
TT0250 # 03 Y:2021 | 03 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,205 | $3,000 | Not Implemented |
TT0250 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,326 | $27,000 | Implemented |
TT0250 # 01 Y:2021 | 01 | 2021 | INCREASE EFFICIENCY OF TRUCKS | $17,586 | $0 | Implemented |
TT0124 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $618 | $2,285 | Implemented |
TT0124 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $326 | $50 | Implemented |
TT0124 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,486 | $9,660 | Implemented |
TT0124 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,755 | $100 | Implemented |
TT0124 # 02 Y:2014 | 02 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $103,306 | $10,000 | Implemented |
TT0124 # 01 Y:2014 | 01 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,604 | $5,500 | Implemented |
TT0074 # 07 Y:2011 | 07 | 2011 | OPTIMIZE PLANT POWER FACTOR | $10,300 | $21,000 | Not Implemented |
TT0074 # 06 Y:2011 | 06 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,100 | $12,000 | Not Implemented |
TT0074 # 05 Y:2011 | 05 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $52,200 | $95,100 | Not Implemented |
TT0074 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,250 | $7,500 | Not Implemented |
TT0074 # 03 Y:2011 | 03 | 2011 | INSULATE BARE EQUIPMENT | $48,800 | $37,500 | Implemented |
TT0074 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,100 | $5,000 | Implemented |
TT0074 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,855 | $61,400 | Implemented |
TT0002 # 01 Y:2007 | 01 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,371 | $0 | Implemented |
TT0002 # 09 Y:2007 | 09 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,324 | $1,400 | Implemented |
TT0002 # 08 Y:2007 | 08 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,553 | $14,000 | Implemented |
TT0002 # 07 Y:2007 | 07 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,296 | $3,500 | Not Implemented |