IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

391

matching recommendations
Reset
NAICS 33351 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0337 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $5,455 $800 Implemented
WV0337 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $5,170 $2,156 Implemented
WV0337 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,690 $0 Implemented
WV0337 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $2,233 $760 Implemented
WV0337 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,082 $590 Implemented
WV0337 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,981 $80 Implemented
WV0337 # 10 Y:2006 10 2006 USE SYNTHETIC LUBRICANT $1,777 $0 Implemented
WV0337 # 13 Y:2006 13 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $674 $1,280 Implemented
UD0738 # 01 Y:2006 01 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $91,800 $6,000 Implemented
UD0738 # 03 Y:2006 03 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $8,313 $0 Implemented
UD0738 # 04 Y:2006 04 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,084 $0 Implemented
UD0738 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,348 $500 Implemented
UD0738 # 08 Y:2006 08 2006 UPGRADE CONTROLS ON COMPRESSORS $859 $0 Implemented
UD0738 # 09 Y:2006 09 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $658 $500 Implemented
UD0738 # 11 Y:2006 11 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $382 $459 Implemented
UD0733 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $252,912 $3,750 Implemented
UD0733 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,973 $29,659 Implemented
UD0733 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,688 $59,616 Implemented
UD0733 # 04 Y:2006 04 2006 RECOVER AND REUSE WASTE MATERIAL $8,505 $5,000 Implemented
UD0733 # 05 Y:2006 05 2006 UPGRADE CONTROLS ON COMPRESSORS $5,125 $0 Implemented
UD0733 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,735 $0 Implemented
UD0733 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $512 $2,200 Implemented
UM0293 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,861 $18,165 Implemented
UM0293 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,506 $175 Implemented
UM0293 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,085 $50 Implemented