IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
NAICS 33351 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0041 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,679 $3,857 Implemented
TR0041 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $17,496 $200,000 Implemented
TR0041 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $28,659 $27,941 Implemented
AM0608 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,900 $1,625 Implemented
AM0608 # 03 Y:2012 03 2012 RECOVER AND REUSE WASTE MATERIAL $144,150 $85,000 Implemented
AM0608 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,200 $124,000 Implemented
AM0608 # 01 Y:2012 01 2012 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,383,679 $251,064 Implemented
TA0103 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $14,113 $0 Implemented
TA0103 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,365 $2,620 Implemented
TA0103 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $0 Implemented
TA0103 # 05 Y:2005 05 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $700 $1,070 Implemented
AM0467 # 10 Y:2004 10 2004 COMBINE UTILITY METERS $190 $0 Implemented
AM0467 # 09 Y:2004 09 2004 USE SYNTHETIC LUBRICANT $240 $0 Implemented
AM0467 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $175 Implemented
AM0467 # 06 Y:2004 06 2004 REUSE RAGS UNTIL COMPLETELY SOILED $700 $0 Implemented
AM0467 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,000 $6 Implemented
AM0467 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,170 $0 Implemented
AM0467 # 03 Y:2004 03 2004 PAY UTILITY BILLS ON TIME $6,075 $0 Implemented
AM0467 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,900 $450 Implemented
AM0467 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $11,900 $2,160 Implemented
TA0075 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $9,615 $150 Implemented
TA0075 # 05 Y:2004 05 2004 INSTALL SET-BACK TIMERS $2,163 $2,350 Implemented
TA0075 # 06 Y:2004 06 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,300 $50 Implemented
TA0075 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,288 $0 Implemented
TA0075 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $1,939 Implemented