IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 33351 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0059 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $246 $100 Implemented
MZ0059 # 10 Y:2010 10 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,000 $15,000 Implemented
MZ0059 # 02 Y:2010 02 2010 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,628 $1,000 Implemented
MZ0059 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,304 $660 Implemented
MZ0059 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,816 $6,000 Implemented
MZ0059 # 09 Y:2010 09 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $24,000 $0 Implemented
MZ0059 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $856 $0 Not Implemented
MZ0059 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $662 $560 Not Implemented
MZ0059 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,793 $4,200 Implemented
MZ0059 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,039 $4,580 Implemented
IC0177 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,982 $15,752 Implemented
IC0177 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $252 $1,520 Not Implemented
IC0177 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $150 $1 Not Implemented
IC0177 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $667 $212 Not Implemented
IC0177 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $1,091 $3,544 Not Implemented
IC0177 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $206 $1 Implemented
UM0371 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,475 $3,500 Implemented
UM0371 # 07 Y:2010 07 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,530 $300,000 Not Implemented
UM0371 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $35,268 Implemented
UM0371 # 04 Y:2010 04 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $4,729 $10 Implemented
UM0371 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $18,676 $3,128 Implemented
UM0371 # 02 Y:2010 02 2010 OPTIMIZE PLANT POWER FACTOR $60,000 $50,000 Implemented
UM0371 # 01 Y:2010 01 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $70,732 $1,319,976 Implemented
TT0056 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,661 $45,225 Not Implemented
TT0056 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,872 $11,208 Not Implemented