Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
128
matching recommendationsNAICS | 333515 | Cutting Tool and Machine Tool Accessory Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0470 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,353 | $5,780 | Implemented |
WI0470 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $1,484 | $896 | Implemented |
WI0470 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,293 | $0 | Implemented |
WI0470 # 07 Y:2004 | 07 | 2004 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,075 | $4,000 | Not Implemented |
WI0470 # 08 Y:2004 | 08 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $579 | $0 | Not Implemented |
UM0246 # 01 Y:2004 | 01 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,080 | $26,630 | Not Implemented |
UM0246 # 02 Y:2004 | 02 | 2004 | INSULATE BARE EQUIPMENT | $6,140 | $700 | Implemented |
UM0246 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,885 | $100 | Implemented |
UM0246 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,380 | $500 | Implemented |
UM0246 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,165 | $2,000 | Not Implemented |
UM0246 # 06 Y:2004 | 06 | 2004 | ADD AREA LIGHTING SWITCHES | $620 | $600 | Not Implemented |
TA0067 # 01 Y:2003 | 01 | 2003 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $19,270 | $-19,270 | Implemented |
TA0067 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,210 | $400 | Not Implemented |
TA0067 # 03 Y:2003 | 03 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,675 | $0 | Not Implemented |
TA0067 # 04 Y:2003 | 04 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $7,485 | $480 | Implemented |
TA0067 # 05 Y:2003 | 05 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,185 | $485 | Implemented |
TA0067 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,970 | $13,700 | Not Implemented |
TA0067 # 07 Y:2003 | 07 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,240 | $0 | Implemented |
TA0067 # 08 Y:2003 | 08 | 2003 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $3,960 | $2,510 | Implemented |
TA0067 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,910 | $0 | Implemented |
TA0067 # 10 Y:2003 | 10 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,940 | $200 | Implemented |
UU0055 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $710 | $710 | Not Implemented |
UU0055 # 02 Y:2003 | 02 | 2003 | ADD AREA LIGHTING SWITCHES | $659 | $500 | Not Implemented |
UU0055 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $430 | $1,870 | Not Implemented |
UU0055 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $889 | $349 | Not Implemented |