IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

282

matching recommendations
Reset
NAICS 333517 Machine Tool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0050 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,560 $2,073 n/a
MU0050 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,159 $262 n/a
MU0050 # 02 Y:2024 02 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $45,726 $23,976 n/a
MU0050 # 09 Y:2024 09 2024 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $540 $2,466 n/a
MU0050 # 07 Y:2024 07 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,230 $0 n/a
MU0050 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $20 $47 n/a
MU0050 # 03 Y:2024 03 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $732 $435 n/a
MU0050 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $320 n/a
MU0050 # 08 Y:2024 08 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $6,301 $10,644 n/a
WM0213 # 02 Y:2024 02 2024 USE RADIANT HEATER FOR SPOT HEATING $3,521 $16,500 Not Implemented
WM0213 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $2,965 $267 Not Implemented
WM0213 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $463 $1,730 Not Implemented
WM0213 # 01 Y:2024 01 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,341 $20,389 Implemented
WM0213 # 04 Y:2024 04 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,240 $2,590 Implemented
WM0213 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,049 $125 Implemented
MZ0307 # 01 Y:2021 01 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,351 $1,250 Not Implemented
MZ0307 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,100 $6,233 Implemented
MZ0307 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $809 $1,130 Implemented
NC0644 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,841 $25,826 Implemented
NC0644 # 02 Y:2019 02 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,191 $30,000 Implemented
NC0644 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,387 $50,000 Not Implemented
NC0644 # 01 Y:2019 01 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $28,909 $65,575 Implemented
NC0644 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,639 $0 Not Implemented
NC0644 # 05 Y:2019 05 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,800 $0 Not Implemented
SU0473 # 05 Y:2019 05 2019 REDUCE VENTILATION AIR $660 $925 Not Implemented