Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
282
matching recommendationsNAICS | 333517 | Machine Tool Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0050 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,560 | $2,073 | n/a |
MU0050 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,159 | $262 | n/a |
MU0050 # 02 Y:2024 | 02 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $45,726 | $23,976 | n/a |
MU0050 # 09 Y:2024 | 09 | 2024 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $540 | $2,466 | n/a |
MU0050 # 07 Y:2024 | 07 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,230 | $0 | n/a |
MU0050 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20 | $47 | n/a |
MU0050 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $732 | $435 | n/a |
MU0050 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $98 | $320 | n/a |
MU0050 # 08 Y:2024 | 08 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $6,301 | $10,644 | n/a |
WM0213 # 02 Y:2024 | 02 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $3,521 | $16,500 | Not Implemented |
WM0213 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $2,965 | $267 | Not Implemented |
WM0213 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $463 | $1,730 | Not Implemented |
WM0213 # 01 Y:2024 | 01 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,341 | $20,389 | Implemented |
WM0213 # 04 Y:2024 | 04 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,240 | $2,590 | Implemented |
WM0213 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,049 | $125 | Implemented |
MZ0307 # 01 Y:2021 | 01 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,351 | $1,250 | Not Implemented |
MZ0307 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,100 | $6,233 | Implemented |
MZ0307 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $809 | $1,130 | Implemented |
NC0644 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,841 | $25,826 | Implemented |
NC0644 # 02 Y:2019 | 02 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $23,191 | $30,000 | Implemented |
NC0644 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,387 | $50,000 | Not Implemented |
NC0644 # 01 Y:2019 | 01 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $28,909 | $65,575 | Implemented |
NC0644 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,639 | $0 | Not Implemented |
NC0644 # 05 Y:2019 | 05 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,800 | $0 | Not Implemented |
SU0473 # 05 Y:2019 | 05 | 2019 | REDUCE VENTILATION AIR | $660 | $925 | Not Implemented |