IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

129

matching recommendations
Reset
NAICS 333517 Machine Tool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0960 # 06 Y:2017 06 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $514 $1,425 Implemented
UD0960 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,273 $0 Implemented
SU0424 # 08 Y:2016 08 2016 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $473 $1,875 Implemented
SU0424 # 04 Y:2016 04 2016 ELIMINATE/REDUCE AN OPERATION $1,305 $800 Implemented
SU0424 # 03 Y:2016 03 2016 PAY BILLS ON TIME TO AVOID LATE FEES $30 $0 Implemented
SU0424 # 05 Y:2016 05 2016 REDUCE VENTILATION AIR $346 $512 Implemented
SU0424 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,548 $0 Implemented
SU0424 # 02 Y:2016 02 2016 DISCONNECT BALLASTS $145 $0 Implemented
SU0424 # 06 Y:2016 06 2016 UPGRADE OBSOLETE EQUIPMENT $42 $114 Implemented
SU0424 # 07 Y:2016 07 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $293 $778 Implemented
SU0402 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $431 $560 Implemented
SU0402 # 10 Y:2015 10 2015 UPGRADE OBSOLETE EQUIPMENT $7,911 $23,244 Implemented
SU0402 # 07 Y:2015 07 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $770 $950 Implemented
SU0402 # 08 Y:2015 08 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $1,495 $2,000 Implemented
SU0402 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $6,073 $600 Implemented
SU0402 # 05 Y:2015 05 2015 REDUCE VENTILATION AIR $8,182 $2,941 Implemented
SU0374 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $379 $276 Implemented
SU0374 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,770 $2,000 Implemented
SU0374 # 06 Y:2014 06 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $931 $2,604 Implemented
MZ0142 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,435 $31,000 Implemented
MA0728 # 02 Y:2014 02 2014 REPLACE BOILER $10,114 $30,450 Implemented
MA0728 # 01 Y:2014 01 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $16,512 $25,775 Implemented
MA0728 # 03 Y:2014 03 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,940 $6,500 Implemented
BS0018 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $600 Implemented
BS0018 # 01 Y:2013 01 2013 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $552 $934 Implemented