IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 333517 Machine Tool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0960 # 06 Y:2017 06 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $514 $1,425 Implemented
UD0960 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,273 $0 Implemented
UD0960 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,390 $1,000 Implemented
UD0960 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,808 $0 Implemented
UD0960 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,385 $0 Implemented
UD0960 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,202 $0 Implemented
WV0427 # 10 Y:2011 10 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,890 $258 Implemented
WV0427 # 09 Y:2011 09 2011 MODIFY STARTUP/SHUTDOWN TIMES $3,115 $975 Implemented
WV0427 # 06 Y:2011 06 2011 SHADE WINDOWS FROM SUMMER SUN $5,176 $81,597 Implemented
WV0427 # 05 Y:2011 05 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,786 $1,000 Implemented
WV0427 # 04 Y:2011 04 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,867 $637 Implemented
UD0733 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $512 $2,200 Implemented
UD0733 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,735 $0 Implemented
UD0733 # 05 Y:2006 05 2006 UPGRADE CONTROLS ON COMPRESSORS $5,125 $0 Implemented
UD0733 # 04 Y:2006 04 2006 RECOVER AND REUSE WASTE MATERIAL $8,505 $5,000 Implemented
UD0733 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,688 $59,616 Implemented
UD0733 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,973 $29,659 Implemented
UD0733 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $252,912 $3,750 Implemented
UD0705 # 01 Y:2004 01 2004 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $50,000 $50,000 Implemented
UD0705 # 11 Y:2004 11 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $83 $0 Implemented
UD0705 # 10 Y:2004 10 2004 COVER OPEN TANKS $710 $0 Implemented
UD0705 # 09 Y:2004 09 2004 UPGRADE CONTROLS ON COMPRESSORS $1,214 $0 Implemented
UD0705 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,683 $0 Implemented
UD0705 # 03 Y:2004 03 2004 REDUCE SCRAP PRODUCTION $12,990 $0 Implemented