Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 3336 | Engine, Turbine, and Power Transmission Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0632 # 11 Y:2022 | 11 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $456 | $1,192 | Implemented |
WV0632 # 10 Y:2022 | 10 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $669 | $3,115 | Implemented |
WV0632 # 09 Y:2022 | 09 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $714 | $1,638 | Implemented |
WV0632 # 08 Y:2022 | 08 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $727 | $92 | Implemented |
WV0632 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $1,112 | $1,037 | Implemented |
WV0632 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,805 | $706 | Implemented |
WV0632 # 02 Y:2022 | 02 | 2022 | IMPROVE COMBUSTION CONTROL CAPABILITY | $5,035 | $3,423 | Implemented |
WV0632 # 12 Y:2022 | 12 | 2022 | INSTALL OCCUPANCY SENSORS | $371 | $1,135 | Implemented |
LE0486 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,174 | $1,540 | Implemented |
LE0486 # 02 Y:2019 | 02 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $8,764 | $720 | Implemented |
LE0486 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,558 | $28,275 | Implemented |
LE0412 # 04 Y:2016 | 04 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $462 | $1,382 | Implemented |
LE0412 # 07 Y:2016 | 07 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,939 | $35,720 | Implemented |
LE0412 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,688 | $19,250 | Implemented |
LE0412 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,397 | $8,050 | Implemented |
WV0329 # 08 Y:2005 | 08 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,468 | $11,504 | Implemented |
WV0329 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,268 | $0 | Implemented |
WV0329 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,535 | $8,398 | Implemented |
WV0329 # 06 Y:2005 | 06 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $6,007 | $729 | Implemented |
WV0329 # 05 Y:2005 | 05 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,423 | $8,360 | Implemented |
WV0329 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,841 | $10,360 | Implemented |
WV0329 # 01 Y:2005 | 01 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $35,587 | $11,800 | Implemented |
WV0329 # 11 Y:2005 | 11 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $732 | $294 | Implemented |
WV0329 # 10 Y:2005 | 10 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $799 | $299 | Implemented |
LE0190 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,074 | $218 | Implemented |