IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

539

matching recommendations
Reset
NAICS 3336 Engine, Turbine, and Power Transmission Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0140 # 11 Y:2008 11 2008 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $9,973 $0 Not Implemented
UW0004 # 01 Y:2007 01 2007 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $13,962 $8,762 Implemented
UW0004 # 02 Y:2007 02 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,182 $25,800 Implemented
UW0004 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,351 $5,595 Not Implemented
UW0004 # 04 Y:2007 04 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,362 $968 Not Implemented
MI0148 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,264 $915 Not Implemented
MI0148 # 02 Y:2007 02 2007 DISCONNECT BALLASTS $5,169 $2,150 Not Implemented
MI0148 # 03 Y:2007 03 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,272 $10,200 Not Implemented
MI0148 # 04 Y:2007 04 2007 INSTALL SKYLIGHTS $5,197 $16,736 Not Implemented
MI0148 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,440 $1,074 Not Implemented
MI0148 # 06 Y:2007 06 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,961 $3,010 Not Implemented
MI0148 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,128 $1,423 Not Implemented
MI0148 # 08 Y:2007 08 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $452 $160 Not Implemented
MA0616 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,636 $132,834 Not Implemented
MA0616 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,128 $3,725 Not Implemented
MA0616 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,603 $2,550 Implemented
MA0616 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $37,450 $12,998 Not Implemented
MA0616 # 05 Y:2007 05 2007 INSTALL TIMERS AND/OR THERMOSTATS $16,346 $1,088 Not Implemented
MA0616 # 06 Y:2007 06 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $709 $300 Not Implemented
TT0001 # 01 Y:2007 01 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $2,856 $3,500 Implemented
TT0001 # 02 Y:2007 02 2007 CLEAN CONDENSER TUBES $1 $26,405 Implemented
TT0001 # 03 Y:2007 03 2007 INSTALL TIMERS AND/OR THERMOSTATS $1,270 $0 Not Implemented
TT0001 # 04 Y:2007 04 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $41,993 $0 Not Implemented
TT0001 # 05 Y:2007 05 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $9,800 $0 Not Implemented
TT0001 # 06 Y:2007 06 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,850 $3,000 Implemented