Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
548
matching recommendationsNAICS | 33361 | Engine, Turbine, and Power Transmission Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0113 # 07 Y:2013 | 07 | 2013 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,948 | $50 | Implemented |
MZ0113 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,620 | $900 | Implemented |
MZ0113 # 09 Y:2013 | 09 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $545 | $902 | Implemented |
MZ0113 # 10 Y:2013 | 10 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $494 | $620 | Implemented |
MZ0113 # 11 Y:2013 | 11 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $488 | $1,050 | Implemented |
IA0493 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $112,998 | $128,338 | Implemented |
IA0493 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $2,326 | $2,120 | Not Implemented |
IA0493 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,452 | $2,000 | Implemented |
IA0493 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,291 | $105 | Implemented |
IA0493 # 05 Y:2013 | 05 | 2013 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,659 | $3,000 | Not Implemented |
IA0493 # 06 Y:2013 | 06 | 2013 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $328 | $200 | Not Implemented |
UK1214 # 01 Y:2012 | 01 | 2012 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $57,123 | $150,767 | Not Implemented |
UK1214 # 02 Y:2012 | 02 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $10,251 | $11,250 | Not Implemented |
UK1214 # 03 Y:2012 | 03 | 2012 | OPTIMIZE PLANT POWER FACTOR | $6,631 | $11,880 | Not Implemented |
UK1214 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $546 | $500 | Not Implemented |
DL0094 # 01 Y:2012 | 01 | 2012 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,550 | $0 | Implemented |
DL0094 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,797 | $12,000 | Not Implemented |
DL0094 # 03 Y:2012 | 03 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,058 | $1,450 | Not Implemented |
DL0094 # 04 Y:2012 | 04 | 2012 | AIR CONDITION ONLY SPACE NECESSARY | $780 | $0 | Implemented |
DL0094 # 05 Y:2012 | 05 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $384 | $0 | Not Implemented |
DL0094 # 06 Y:2012 | 06 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,392 | $7,320 | Not Implemented |
DL0094 # 07 Y:2012 | 07 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $570 | $10 | Not Implemented |
MZ0097 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $230,479 | $107,601 | Not Implemented |
MZ0097 # 02 Y:2012 | 02 | 2012 | INSULATE BARE EQUIPMENT | $106,168 | $10,690 | Not Implemented |
MZ0097 # 03 Y:2012 | 03 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $60,715 | $105,000 | Not Implemented |